0+ unit
Rebuilt From Rebuilt As Rbld Notes NS GP50 NS RP-M4C Work Done: - Complete conversion to new slug - New cab installed and original long hood retained - Dynamic brake equipped - Approximately 25 yards of concrete added for ballast - Switched to short hood forward Notes: - These are road slugs with cabs and full height long hoods setup to operate with the GP59E masters - Classified by NS as power group 2, 5 axles of power, 5 axles of extended range/high capacity dynamics
Copyright © 2011-2012 Lance Myers. All rights reserved.